Week of August 13 - 18, 2007




Thank you Contract Lumber for our porch which Will B. is painting.







Dave Miller installed cabinet blocking for the kitchen cabinets and blocking for the time on the first floor.







This is the water distribution system which was donated by Curnayn Sales Inc., (440) 846- 1280. This manifold is called a Manabloc and used a non PVC piping system. Each faucet is connected directly to the Manabloc.









The gable returns on the back of the garage are finished.