February 4 - 16, 2008


The 97% efficiency furnace has been installed.











This is the door hardware for the house on top of the carpet that will be on the stairways and in the bedrooms. This is Shaw carpet that is non-toxic to humans and is made from carpet and can be made back into carpet once the life of the carpet has been reached.






Here is a messy job of reworking the insulation in the rim joist area of the house located in the basement.










Here is a shaky shot (due to a long aperature opening time) of the mess created in reworking the insulation.






This is like the picture below but is taken with a tripod to avoid the "jiggle" when one enlarges the picture. This was taken with a longer aperature time like the picture in the previous post but this one will look good when englarged.
January 28 - February 3, 2008

The interior has it's first coat of paint and the trim was installed throughout the house.




Looking at the stairway, basement and bathroom doors.




View from the kitchen to the front of the house.









View from the kitchen to the front door.






Interior of the front bedroom.