April 20, 2008

With some beautiful weather last week, the house is beginning to be wrapped up.











Left and above left: The solid maple flooring ready to be sanded.










The recycled content tile in the master bathroom. The shower surround will be also be tiled.










The newly rebuilt stonewall ready for landscaping this week.





The approach to the driveway with the porus pavers that are seeded with grass seed which is ready to grow.

April, 13,2008

The house is starting to get it's interior flooring and cabinetry installed.


Below: Shaw carpet squares installed in the upstairs. One noticeable feature was the absence of the "new carpet smell" which is the result of the toxic organic volatile organic compounds that off-gas from all other brands of carpets.











Below: The native maple hardwood flooring that has just begun to be installed.














Left: "Green" cherry kitchen cabinets supplied by Greenleaf Cabinetry that were installed by Dave Miller, Chad Boyd, and Roger Beck



Below: A series of picture taken of the same hallway/closet during the build.